| 1. | The optimum analysis in designing a steel box beam 钢结构箱形梁桥结构尺寸优化分析 |
| 2. | Static experiment for double - track box beam 双线箱梁静载试验研究 |
| 3. | Analysis of shear lag effect of great cantilever steel box beam 大悬臂钢脊骨梁结构模型剪力滞效应探讨 |
| 4. | Observation and control of settlement of light rail continuous box beam 轻轨连续箱梁沉降观测及控制技术 |
| 5. | Construction of cast - in - place box beam of dongshengbei interchange bridge 东胜北互通立交匝道桥现浇箱梁施工 |
| 6. | Crack analysis and assessment of a pc continuous rigid frame box beam bridge 大跨径连续刚构箱梁剪力滞效应分析 |
| 7. | Experimental study on stress property of box beam using grc abnormity internal mold 钢筋各4根进行拉伸试验和9个150 |
| 8. | In the railroad oblique continual box beam bridge design key question studies 铁路斜交连续箱梁桥设计中的关键问题研究 |
| 9. | The techniques for controlling the cracks on the leveling course of the composite box beam 组合箱梁调平层裂缝防治技术 |
| 10. | Analysis of pure torsion for thin - walled composite mono - box beams with multi - cells 单箱多室复合材料薄壁箱形梁的纯扭转分析 |